Backfill and Cement floor prep

Backfill and Cement floor prep

We are back from our holiday break and our builders have been hard at work over the last month installing counterforts that help brace the foundation wall for all the dirt that we have backfilled along the perimeter. A waterproof membrane was also installed to protect the base of our new addition for decades to come.

Plumbing and Electrical

Rough plumbing for drains and electrical conduit have been installed and rebar placed along the entire area inside of the walls in preparation for the cement subfloor to be poured this Monday.